Minhan Boiler Project Tri Viet – Hung Yen

Minhan Boiler Project Tri Viet – Hung Yen
Investor: Tri Viet Power Co., Ltd
Commencement: 24/08/2024
Status: Boiler Operation
 Services provided: - Project Management Consulting
- On-site Installation Supervision
- Cost Assessment and Control

 

The “Minhan Boiler Project Tri Viet – Hung Yen” is an industrial equipment investment and installation package serving production operations at Tan Quang Industrial Zone for Minhan Paper Factory. The boiler system has a design capacity of 75 tons of steam per hour (75 t/h) and is installed and operated in accordance with current Vietnamese technical standards, occupational safety regulations, environmental protection requirements, and industry-specific regulations.

DFS is responsible for supervising the following aspects:
+ Reviewing and commenting on construction design documents, project schedule, and construction conditions;
+ Supervising the technical execution and quality of equipment installation and construction;
+ Monitoring the construction progress, verifying work volumes, and inspecting the quality of materials and equipment supplied;
+ Reviewing and compiling as-built documentation, acceptance records, and payment dossiers;
+ Supervising compliance with occupational safety regulations, fire prevention and fighting, and environmental protection;
+ Supporting the Investor in the acceptance testing, commissioning, and final handover of the equipment system, as well as contract finalization procedures.

With deep technical expertise and extensive experience in industrial projects, DFS is committed to delivering effective management solutions, ensuring the project is executed in accordance with design, complies with technical standards, and is ready for safe and stable operation.